Certainteed cement siding installation guide.
Asphalt roofing cement should meet astm d 4586 type ii.
2015 allura installation guide 2014 allura installation manual.
These strips installed at the bottom will make your first row of siding angle out to match the rest of the rows.
Snap a line 1 in.
Above the bottom of the wall sheathing as a guide.
Certainteed weatherboards fiber cement siding was aquired by plycem usa a wholly owned subsidiary of elementia of mexico and is now sold under the brand allura.
Certainteed weatherboards fiber cement siding installation manual 3 keyway a recess or groove in a manufactured shake or shingle siding panel.
Certainteed shall not accept any liability or responsibility under.
Find your most beat up pieces of siding and rip them down into 1 1 4 in.
Also referred to as casing.
Lap where two siding panels join horizontally one over the other.
Install 2 layers of weather resistant barrier.
Create a scratch coat in the mortar let dry for the day.
Fiber cement siding warranty information.
Lineal molding of various widths used to trim door and window openings at the jambs.
Continuing drying for the day.
If your property is located in canada and the fiber cement siding was installed between january 1 1999 and july 1 2016 visit www certainteedsettlement ca or call 1 866 482 5436.
Their purpose is to provide detailed information and how to tips that will simplify the installation process.
Install these fragile starter strips with a 15 gauge trim gun.
These instructions describe and illustrate the steps involved in installing certainteed and wolverine siding trim and accessories.
Apply mortar to back of stone press onto the scratch coat let dry for the day.
Continuing drying for the day day 6.
Apply 1 spots of asphalt roofing cement under each corner and at about 12 to 13 in from each edge.
Use six nails and four spots of asphalt roofing cement for every full shingle for every full shingle as shown below.
Apply a coat of mortar.